User Tools

Site Tools


howto:measuring_quantum_yield

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
howto:measuring_quantum_yield [2015/02/25 13:51] bornemannhowto:measuring_quantum_yield [2015/02/25 13:52] bornemann
Line 9: Line 9:
  
 ===== Setp-by-Step ===== ===== Setp-by-Step =====
-  * Insert the integrating sphere with caution in order not to hit any optical elements in the FT300. The integrating sphere assembly has an indexed lid to ensure proper orientation.+  * Insert the integrating sphere with caution in order not to hit any optical elements in the FluoTime 300. The integrating sphere assembly has an indexed lid to ensure proper orientation.
  
 {{ :howto:2013-12-19_at_14-30-03.jpg?600 |}} {{ :howto:2013-12-19_at_14-30-03.jpg?600 |}}
Line 24: Line 24:
 {{ :howto:2013-12-19_at_14-35-27.jpg?600 |}} {{ :howto:2013-12-19_at_14-35-27.jpg?600 |}}
  
-  * Switch on FT300.+  * Switch on FluoTime 300.
   * Start the EasyTau Software.   * Start the EasyTau Software.
   * Open or create a workspace.   * Open or create a workspace.
howto/measuring_quantum_yield.txt · Last modified: 2017/07/12 13:16 by peter